1 00:00:28,820 --> 00:00:25,450 [Music] 2 00:00:31,609 --> 00:00:28,830 the fourth Saturn 1b launch vehicle a s 3 00:00:34,340 --> 00:00:31,619 204 is presently scheduled for launch 4 00:00:35,930 --> 00:00:34,350 early in the next quarter at the end of 5 00:00:38,330 --> 00:00:35,940 the quarter the flight readiness test 6 00:00:41,479 --> 00:00:38,340 had been successfully completed the 7 00:00:46,040 --> 00:00:41,489 flight designation of a s 204 is Apollo 8 00:00:47,750 --> 00:00:46,050 5a s 204 LM 1 in addition to serving as 9 00:00:50,540 --> 00:00:47,760 an Apollo Saturn development flight 10 00:00:52,510 --> 00:00:50,550 Apollo 5 will also be the final flight 11 00:00:57,099 --> 00:00:52,520 to carry launch vehicle R&D 12 00:01:00,709 --> 00:00:57,109 instrumentation in the Saturn 1b program 13 00:01:01,849 --> 00:01:00,719 all remaining Saturn 1b stages are on or 14 00:01:07,460 --> 00:01:01,859 ahead of schedule 15 00:01:09,289 --> 00:01:07,470 booster status is as follows s1 b5 is 16 00:01:12,260 --> 00:01:09,299 presently undergoing post storage 17 00:01:15,740 --> 00:01:12,270 modifications checkout is expected to 18 00:01:20,929 --> 00:01:15,750 start in early January 1968 and shipment 19 00:01:22,850 --> 00:01:20,939 will meet the KSC need date s1 b6 was 20 00:01:25,190 --> 00:01:22,860 removed from storage during this quarter 21 00:01:28,100 --> 00:01:25,200 and post storage modifications were 22 00:01:30,109 --> 00:01:28,110 completed in mid-november at the end of 23 00:01:31,910 --> 00:01:30,119 the quarter post storage checkout tests 24 00:01:34,010 --> 00:01:31,920 were completed and the stage is 25 00:01:37,069 --> 00:01:34,020 scheduled to be delivered to KSC next 26 00:01:40,460 --> 00:01:37,079 quarter a successful flight of Apollo 5 27 00:01:45,139 --> 00:01:40,470 could cause the a.s 206 LM - mission to 28 00:01:47,539 --> 00:01:45,149 be cancelled s1 b7 was removed from 29 00:01:49,130 --> 00:01:47,549 storage in late December and the stage 30 00:01:51,830 --> 00:01:49,140 contractor directed the start 31 00:01:53,719 --> 00:01:51,840 modification using the most economical 32 00:01:55,520 --> 00:01:53,729 production plan consistent with the 33 00:02:00,859 --> 00:01:55,530 relatively long lead time delivery 34 00:02:03,590 --> 00:02:00,869 requirement s1 b 8 9 and 10 stages were 35 00:02:07,940 --> 00:02:03,600 in storage at Chrysler masu during and 36 00:02:11,360 --> 00:02:07,950 at the end of the quarter on October 37 00:02:13,790 --> 00:02:11,370 20th the s-1 b11 stage left Mishu on the 38 00:02:15,620 --> 00:02:13,800 barge Palamon enroute to Marshall 39 00:02:19,430 --> 00:02:15,630 Space Flight Center for static firing 40 00:02:22,250 --> 00:02:19,440 tests the stage was offloaded at 41 00:02:26,540 --> 00:02:22,260 Marshall on October 30th and transported 42 00:02:28,460 --> 00:02:26,550 to the static test tower the stage was 43 00:02:30,920 --> 00:02:28,470 erected in the test stand on November 44 00:02:32,930 --> 00:02:30,930 2nd additional testing which will 45 00:02:34,790 --> 00:02:32,940 provide increased confidence prior to 46 00:02:37,760 --> 00:02:34,800 the first manned flight will be 47 00:02:39,320 --> 00:02:37,770 conducted on s1b 11 to determine 48 00:02:42,520 --> 00:02:39,330 dampening characteristics of the 49 00:02:45,950 --> 00:02:42,530 clustered s1 bh1 engine combination 50 00:02:48,470 --> 00:02:45,960 termed engine bomb tests this program 51 00:02:51,080 --> 00:02:48,480 will consist of five 15-second firings 52 00:02:54,200 --> 00:02:51,090 after the initial short duration static 53 00:02:57,080 --> 00:02:54,210 test during the five firings combustion 54 00:02:59,750 --> 00:02:57,090 instability will be induced in two R&D 55 00:03:01,640 --> 00:02:59,760 test engines installed on the stage for 56 00:03:05,530 --> 00:03:01,650 these tests and the dampening 57 00:03:08,060 --> 00:03:05,540 characteristics recorded and analyzed 58 00:03:10,190 --> 00:03:08,070 original testing schedules were delayed 59 00:03:12,560 --> 00:03:10,200 to permit study and instrumentation 60 00:03:15,140 --> 00:03:12,570 additions which will provide data to be 61 00:03:18,830 --> 00:03:15,150 used as baselines for the engine bomb 62 00:03:20,870 --> 00:03:18,840 test program this baseline data was 63 00:03:23,900 --> 00:03:20,880 obtained during the first short duration 64 00:03:30,110 --> 00:03:23,910 static test of s1 b11 conducted 65 00:03:32,720 --> 00:03:30,120 successfully on december 19 1967 final 66 00:03:35,180 --> 00:03:32,730 assembly of s1 b12 was completed early 67 00:03:37,270 --> 00:03:35,190 in this quarter and the stage checkout 68 00:03:39,800 --> 00:03:37,280 was completed December 21st 69 00:03:41,330 --> 00:03:39,810 while the stage is currently scheduled 70 00:03:43,100 --> 00:03:41,340 for shipment in early January to 71 00:03:46,040 --> 00:03:43,110 Marshall Space Flight Center prostatic 72 00:03:48,370 --> 00:03:46,050 firing delay in shipment is anticipated 73 00:03:50,750 --> 00:03:48,380 due to the engine bomb test program 74 00:03:54,949 --> 00:03:50,760 whittled for completion by the end of 75 00:03:57,740 --> 00:03:54,959 February 1968 final full duration firing 76 00:04:01,130 --> 00:03:57,750 of s1 11 is presently scheduled for 77 00:04:03,050 --> 00:04:01,140 March 1968 however this delay will not 78 00:04:07,580 --> 00:04:03,060 adversely affect the overall stage 79 00:04:10,509 --> 00:04:07,590 delivery requirements part and component 80 00:04:12,610 --> 00:04:10,519 fabrication for s 1b 13 through 16 81 00:04:16,280 --> 00:04:12,620 continued throughout the quarter in 82 00:04:20,900 --> 00:04:16,290 addition minor sub assembly of s1 B 13 83 00:04:24,080 --> 00:04:20,910 was in progress the status of the second 84 00:04:27,590 --> 00:04:24,090 RS 4b stages of the Saturn 1b are as 85 00:04:29,900 --> 00:04:27,600 follows the s4 B 205 86 00:04:34,850 --> 00:04:29,910 stage was in modification during the 87 00:04:36,440 --> 00:04:34,860 quarter s4b 206 modifications were 88 00:04:38,750 --> 00:04:36,450 completed during the last part of the 89 00:04:41,900 --> 00:04:38,760 quarter and it is presently in post 90 00:04:46,550 --> 00:04:41,910 storage checkout shipment to KSC is 91 00:04:51,170 --> 00:04:46,560 scheduled for next quarter s 4b stages 92 00:04:53,780 --> 00:04:51,180 207 through 212 are in storage s 4b 212 93 00:04:55,520 --> 00:04:53,790 assembly was completed and the stage was 94 00:05:00,530 --> 00:04:55,530 placed in storage at Huntington Beach 95 00:05:04,330 --> 00:05:00,540 during this quarter Saturn 1b instrument 96 00:05:07,820 --> 00:05:04,340 unit status and progress is as follows 97 00:05:09,950 --> 00:05:07,830 ru 205 after being scheduled for storage 98 00:05:12,380 --> 00:05:09,960 was retained in the modification program 99 00:05:17,660 --> 00:05:12,390 and work continued on an extended 100 00:05:18,920 --> 00:05:17,670 schedule modifications on iu 206 taken 101 00:05:21,260 --> 00:05:18,930 out of storage at the end of the 102 00:05:23,840 --> 00:05:21,270 previous quarter have been completed and 103 00:05:28,670 --> 00:05:23,850 the stage was in post storage check out 104 00:05:35,060 --> 00:05:28,680 at the end of this quarter I use stages 105 00:05:37,130 --> 00:05:35,070 207 and 208 are in storage aiyoo 209 was 106 00:05:42,560 --> 00:05:37,140 completed during the quarter accepted 107 00:05:44,090 --> 00:05:42,570 and placed in storage at IBM iu 210 108 00:05:47,270 --> 00:05:44,100 manufacture and assembly is 109 00:05:49,280 --> 00:05:47,280 approximately 90% complete however since 110 00:05:51,590 --> 00:05:49,290 final flight configuration has not been 111 00:05:53,840 --> 00:05:51,600 determined no work has been accomplished 112 00:05:55,580 --> 00:05:53,850 since the middle of the quarter and the 113 00:06:00,830 --> 00:05:55,590 unit has been temporarily placed in 114 00:06:03,560 --> 00:06:00,840 storage SIU 211 structural assembly was 115 00:06:07,760 --> 00:06:03,570 completed this quarter and the IU was 116 00:06:10,250 --> 00:06:07,770 placed in temporary storage component 117 00:06:14,420 --> 00:06:10,260 parts for instrument unit 212 are 118 00:06:16,340 --> 00:06:14,430 currently being received during this 119 00:06:18,560 --> 00:06:16,350 quarter a storage system based on 120 00:06:21,190 --> 00:06:18,570 previous studies and research by several 121 00:06:24,200 --> 00:06:21,200 Marshall Center offices was finalized 122 00:06:26,210 --> 00:06:24,210 basically this plan calls for a large 123 00:06:29,210 --> 00:06:26,220 tent-like enclosure of flame-retardant 124 00:06:31,550 --> 00:06:29,220 synthetic materials suspended from roof 125 00:06:33,980 --> 00:06:31,560 structures over the vehicle and sealed 126 00:06:36,530 --> 00:06:33,990 at the bottom with weights or sandbags a 127 00:06:38,750 --> 00:06:36,540 small commercial type air-conditioning 128 00:06:40,790 --> 00:06:38,760 unit will be used to maintain humidity 129 00:06:41,420 --> 00:06:40,800 within the enclosure at less than 40 130 00:06:44,300 --> 00:06:41,430 percent 131 00:06:47,210 --> 00:06:44,310 humidity with temperature normally at 85 132 00:06:48,740 --> 00:06:47,220 degrees the cost of such a storage 133 00:06:51,230 --> 00:06:48,750 system is estimated to be very 134 00:06:53,380 --> 00:06:51,240 economical in both initial equipment 135 00:06:55,610 --> 00:06:53,390 required and in operational costs 136 00:06:57,560 --> 00:06:55,620 testing of the equipment and system 137 00:07:00,320 --> 00:06:57,570 performance will be made during the next 138 00:07:05,540 --> 00:07:00,330 quarter utilizing a Saturn ground test 139 00:07:08,330 --> 00:07:05,550 stage astronauts schirra Dukes Russa 140 00:07:09,980 --> 00:07:08,340 young Isley and Cunningham members of 141 00:07:12,860 --> 00:07:09,990 the first manned flight crew of the 142 00:07:15,260 --> 00:07:12,870 Saturn 1b made working tours of the IBM 143 00:07:18,230 --> 00:07:15,270 Huntsville facility and Marshall Space 144 00:07:20,960 --> 00:07:18,240 Flight Center during early October at 145 00:07:23,720 --> 00:07:20,970 IBM these astronauts received intensive 146 00:07:29,960 --> 00:07:23,730 briefings on a s 205 mission hardware 147 00:07:32,480 --> 00:07:29,970 and inspected SIU 205 at MSFC the 148 00:07:36,670 --> 00:07:32,490 astronauts visited the Apollo access arm 149 00:07:38,630 --> 00:07:36,680 test area president lyndon b johnson 150 00:07:41,690 --> 00:07:38,640 visited the Michoud assembly facility 151 00:07:43,970 --> 00:07:41,700 December 12th accompanying the President 152 00:07:46,520 --> 00:07:43,980 on his tour where the governor of 153 00:07:48,980 --> 00:07:46,530 Louisiana John J McKeon NASA 154 00:07:52,010 --> 00:07:48,990 Administrator and mrs. James E web and 155 00:07:54,800 --> 00:07:52,020 other NASA personnel the president 156 00:07:59,180 --> 00:07:54,810 toured the Saturn 1b and Saturn 5 first 157 00:08:01,370 --> 00:07:59,190 stages assembly area activity on the 158 00:08:03,500 --> 00:08:01,380 orbital workshop aspects of the s4b 159 00:08:05,600 --> 00:08:03,510 during the quarter were primarily 160 00:08:08,090 --> 00:08:05,610 directed to modification of the workshop 161 00:08:12,590 --> 00:08:08,100 mock-up which was returned to McDonnell 162 00:08:14,600 --> 00:08:12,600 Douglas late last quarter reworking of 163 00:08:17,600 --> 00:08:14,610 the full-scale mock-up will result in a 164 00:08:19,940 --> 00:08:17,610 two level floor configuration following 165 00:08:23,090 --> 00:08:19,950 completion of rework the mock-up will be 166 00:08:27,560 --> 00:08:23,100 returned early next quarter to MSFC for 167 00:08:29,270 --> 00:08:27,570 further design evaluation at the end of 168 00:08:31,790 --> 00:08:29,280 this quarter the major aspect of the 169 00:08:35,000 --> 00:08:31,800 Saturn 1b program is the launch of a s2o 170 00:08:40,040 --> 00:08:35,010 for presently scheduled for mid January 171 00:08:42,920 --> 00:08:40,050 1968 a s2o for the final R&D vehicle in 172 00:08:44,990 --> 00:08:42,930 the Saturn 1b program will carry over 173 00:08:48,260 --> 00:08:45,000 1,200 telemetry measurements of the 174 00:08:51,110 --> 00:08:48,270 launch vehicle itself in addition to 175 00:08:53,000 --> 00:08:51,120 final 1b development aspects the overall 176 00:08:55,390 --> 00:08:53,010 flight which will be designated Apollo 177 00:08:57,610 --> 00:08:55,400 5a s 204 LM one 178 00:09:00,790 --> 00:08:57,620 we'll be a direct Apollo Saturn 179 00:09:03,040 --> 00:09:00,800 development flight general objectives of 180 00:09:05,230 --> 00:09:03,050 the overall flight will be the verify 181 00:09:08,140 --> 00:09:05,240 operation of the lunar module ascent and 182 00:09:10,980 --> 00:09:08,150 descent propulsion sub systems including 183 00:09:13,350 --> 00:09:10,990 descent propulsion system restart 184 00:09:17,770 --> 00:09:13,360 evaluation of the lunar module structure 185 00:09:20,740 --> 00:09:17,780 lunar module staging and s4 BIU orbital 186 00:09:23,800 --> 00:09:20,750 performance detailed launch vehicle 187 00:09:26,020 --> 00:09:23,810 primary objectives will be evaluation of 188 00:09:29,190 --> 00:09:26,030 the launch vehicle altitude control 189 00:09:32,020 --> 00:09:29,200 system and maneuvering capability 190 00:09:34,240 --> 00:09:32,030 verification of the s4b liquid hydrogen 191 00:09:37,240 --> 00:09:34,250 and liquid oxygen tank pressure rise 192 00:09:41,310 --> 00:09:37,250 rate demonstration of nose cone 193 00:09:43,690 --> 00:09:41,320 separation from s4 biu SLA and 194 00:09:46,240 --> 00:09:43,700 evaluation of operational adequacy of 195 00:09:48,460 --> 00:09:46,250 the launch vehicle systems including 196 00:09:52,450 --> 00:09:48,470 guidance control electrical mechanical 197 00:09:54,760 --> 00:09:52,460 and instrumentation secondary launch 198 00:09:57,160 --> 00:09:54,770 vehicle objectives will be evaluation of 199 00:10:00,160 --> 00:09:57,170 s4b forward skirt in-flight panel 200 00:10:03,010 --> 00:10:00,170 flutter j2 engine crossover duct 201 00:10:05,650 --> 00:10:03,020 temperature s4b propellant dump 202 00:10:09,220 --> 00:10:05,660 experiment and launch vehicle orbital 203 00:10:10,840 --> 00:10:09,230 coast lifetime capability all of the 204 00:10:13,990 --> 00:10:10,850 objectives both primary and secondary 205 00:10:16,780 --> 00:10:14,000 are vital and directly related to future 206 00:10:18,000 --> 00:10:16,790 Saturn 5 launches and the lunar landing